SUBDIVISION

FLETCHER LANE

fletcher-lane-banner1.jpg

41 LOT RESIDENTIAL SUBDIVISION

October 2015 - May 2016


A 41 lot subdivision that was the last stage as part of a much larger project. The project came with a few challenges in that it had a unique shape wrapping around and between existing houses.

The project was a success with TDM Construction Ltd continuing on the relationship with the client in subsequent projects.

WORK COMPLETED

  • Bulk earthworks
  • Utilities
  • Wastewater and stormwater
  • Public roading
  • Private right-of-way installation
  • Pavement installation